A Mining Operation in Northern Canada required at least 850KW 600v Arctic enclosed Genset that could be quickly moved to their location to crush rock to widen the existing haul road.
RLN located a suitable unit verified it’s condition and organized transportation of this unit to the site on the existing ice road just before it’s closing date in late spring.